Greater Gabbard topsides
| Client |
Siemens Energy |
| Location: |
27 km off the coast of Suffolk |
| Contract type: |
EPC
(Engineering, Procurement, Construction)
|
| Structure: |
Topsides Offshore Substation Platform |
| Dimensions topsides: |
39 x 31 x 18m (LxWxH)
|
| Weight topsides: |
2,100 t
|
| Contract award: |
5 May 2008 |
|
|
|