Sheringham Shoal topsides
| Client |
AREVA T&D UK Ltd. |
| Location |
17-23 km north of Norfolk coast, UK. |
| Contract type |
Construction |
| Structures |
Two offshore windfarm topsides |
| Dimensions topsides |
30.5 x 17.7 x 16 m (LxWxH) |
| Weight topsides |
approx. 1,000 t each |
| Contract award |
17 August 2009 LOI |
|
|