RWE Dea UK contracted HFG's Vlissingen yard in April 2010 for the Engineering, Procurement and Construction of the Clipper South platform. This fast track EPC project was executed in parallel with the RWE Breagh Alpha platform and achieved the highest possible completion and commissioning levels onshore.

The design of the jacket was executed by HFG's in-house engineering firm HFG Engineering. The topside of the Clipper South platform consist of a four layer deck plus a helicopter platform. Heerema Vlissingen started the fabrication of the jacket at the end of 2010 and only 8 months later it sailed to its final offshore destination for installation.

Client:RWE Dea UK
Contract type:EPC (Engineering, Procurement & Construction)
Location:70 km nordeast of Bacton, Norfolk, United Kingdom
Structures:

Topside
Jacket
Project completion: 2011