In april 2009 HFG Engineering received the contract award for the FEED study of Statoil's Gudrun jacket.

The FEED study was an extended FEED including a multiple phase analyses because of the critical weight of the jacket with regards to liftability of the 7,000 tons jacket.

Client:Statoil Hydro
Contract type:FEED Study
Location:Gudrun Field, Norwegian Continental Shelf
Structures:Jacket
Project completion: 2009