Shell U.K awarded Heerema Hartlepool the construction contract for the Sean Compression module in 2006, after conclusion of a concept selection study. This study concluded that the optimum concept would be a new compression module located on the existing Sean PD platform topsides.

This compression module, constructed at Heerema’s fabrication yard in Hartlepool was located on the existing Sean PD platform topsides.

End of August 2007 the construction was finalized and the Sean Compression module, loaded on a seagoing barge, set sail for its final destination in the U.K. Southern North Sea.  Installation of the module was performed by Heerema Marine Contractor’s Hermod crane vessel

Client:Shell UK Ltd.
Contract type:Construction
Location:UK Southern North Sea
Structures:Compression module
Project completion: 2007